The present document provides the Protocol Implementation Conformance Statement (PICS) proforma for Signalling Connection Control Part (SCCP) signalling protocol of Signalling System No.7 for use between and, optionally, in public networks as specified in EN 300 009-1 [1] in compliance with the relevant requirements and in accordance with the relevant guidance given in ISO/IEC 9646-7 [4].
The supplier of a protocol implementation that is claimed to conform to EN 300 009-1 [1] is required to complete a copy of the PICS proforma provided in annex A of the present document and is required to provide the information necessary to identify both the supplier and the implementation.
- Edition:
- 1.4.1
- Published:
- 04/01/2002
- Number of Pages:
- 29
- File Size:
- 1 file , 130 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus
Reviews
There are no reviews yet.