ETSI TR 103 365 specifies a time domain based procedure for UWB Peak Power measurements. It is intended asan alternative in addition to the frequency domain measurement technique outlined in clause 7.4.4 of ETSITS 102 883 [i.4].
The proposed procedure is applicable to all UWB signal types. It provides more accurate results compared to thefrequency domain measurement in case a correction factor needs to be applied for frequency domain measurementswith RBW smaller than 50 MHz.
- Edition:
- 1.1.1
- Published:
- 02/01/2016
- Number of Pages:
- 17
- File Size:
- 1 file , 210 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus
Reviews
There are no reviews yet.