Sale!

ISA 77.43.01

Original price was: $130.00.Current price is: $65.00.

The scope of this standard is to address the unit/plant demanddevelopment subsystem for boilers with steaming capacities of200,000 lbs/hr (25 kg/s) or greater. This subsystem includesgeneration demand, boiler demand development, turbine demanddevelopment, throttle/header pressure control, and unitmegawatt/steam flow control as applicable.

This standard will address two types of processapplications:

a) a single boiler supplying a single turbine, typical of anelectric utility power plant; and

b) a single boiler or multiple boilers supplying a commondistribution header, typical of an industrial power plant.

Specifically excluded from consideration are:

a) dispatch control;

b) turbine/generator control (other than turbine demand);

c) feedwater controls

d) steam temperature controls (covered separately byANSI/ISA-77.44.01, Fossil Fuel Power Plant – Steam TemperatureControls);

e) combustion controls (covered separately by ANSI/ISA-77.41.01,Fossil Fuel Power Plant Boiler Combustion Controls);

f) steam distribution control systems;

g) economic loading of boilers; and

h) fluidized bed boilers.

Purpose

The purpose of this document is to establish the minimumrequirements for the functional design specifications of unit/plantdemand development for control systems for fossil-fueled powerplant boilers.

Edition:
14
Published:
12/22/2014
ANSI:
ANSI Approved
Number of Pages:
32
File Size:
1 file , 520 KB

Reviews

There are no reviews yet.

Be the first to review “ISA 77.43.01”

Your email address will not be published. Required fields are marked *

Shopping Cart
ISA 77.43.01
Original price was: $130.00.Current price is: $65.00.