Sale!

ACI MCP209

Original price was: $60.00.Current price is: $30.00.

Includes Index of complete Manual of Concrete Practice

Contents:

225R-99 (Reapproved 2005) — Guide to the Selection and Use of Hydraulic Cements

228.1R-03 — In-Place Methods to Estimate Concrete Strength

228.2R-98 (Reapproved 2004) — Nondestructive Test Methods for Evaluation of Concrete in Structures

229R-99 (Reapproved 2005) ) — Controlled Low-Strength Materials

230.1R-90 (Reapproved 1997) — Report on Soil Cement

232.1R-00 (Reapproved 2006) — Use of Raw or Processed Natural Pozzolans in Concrete

232.2R-03 — Use of Fly Ash in Concrete

233R-03 — Slag Cement in Concrete and Mortar

234R-06 — Guide for the Use of Silica Fume in Concrete

237R-07 — Self-Consolidating Concrete

238.1R-08 — Report on Measurements of Workability and Rheology of Fresh Concrete

301-05 — Specifications for Structural Concrete

301M-05 (Synopsis only) — Metric Specifications for Structural Concrete

SP-15(05) (Synopsis only) — Field Reference Manual

302.1R-04 — Guide for Concrete Floor and Slab Construction

302.2R-06 — Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials

303R-04 — Guide to Cast-in-Place Architectural Concrete

303.1-97 — Standard Specification for Cast-in-Place Architectural Concrete

304R-00 — Guide for Measuring, Mixing, Transporting, and Placing Concrete

304.1R-92 (Reapproved 2005) — Guide for the Use of Preplaced Aggregate Concrete for Structural and Mass Concrete Applications

304.2R-96 (Reapproved 2008) — Placing Concrete by Pumping Methods

304.3R-96 (Reapproved 2004) — Heavyweight Concrete: Measuring, Mixing, Transporting, and Placing

304.6R-91 (Reapproved 1997) — Guide for the Use of Volumetric-Measuring and Continuous Mixing Concrete Equipment

305R-99 — Hot Weather Concreting

305.1-06 — Specification for Hot Weather Concreting

306R-88 (Reapproved 2002) — Cold Weather Concreting

306.1-90 (Reapproved 2002) — Standard Specification for Cold Weather Concreting

307-08 –Code Requirements for Reinforced Concrete Chimneys and Commentary

308R-01 (Reapproved 2008) — Guide to Curing Concrete

308.1-98 — Standard Specification for Curing Concrete

309R-05 — Guide for Consolidation of Concrete

309.1R-08 — Report on Behavior of Fresh Concrete During Vibration

309.2R-98 (Reapproved 2005) — Identification and Control of Visible Effects of Consolidation on Formed Concrete Surfaces

309.5R-00 (Reapproved 2006) — Compaction of Roller-Compacted Concrete

311.1R-07 [SP-2(07)] (Synopsis only) — ACI Manual of Concrete Inspection

311.4R-05 — Guide for Concrete Inspection

311.5R-04 — Guide for Concrete Plant Inspection and Testing of Ready-Mixed Concrete

313.97 — Standard Practice for Design and Construction of Concrete Silos and Stacking Tubes for Storing Granular Materials

313R-97 — Commentary on Standard Practice for Design and Construction of Concrete Silos and Stacking Tubes for Storing Granular Materials

315-99 –Details and Detailing of Concrete Reinforcement

Conversion Factors: Inch-Pound to S.I Metric

SP-66(04) — ACI Detailing Manual (Synopsis only)

Published:
2009
Part of:
ACI MCP09PACK

Reviews

There are no reviews yet.

Be the first to review “ACI MCP209”

Your email address will not be published. Required fields are marked *

Shopping Cart
ACI MCP209
Original price was: $60.00.Current price is: $30.00.