Sale!

ANS 56.5

Original price was: $164.00.Current price is: $98.00.

PWR and BWR Containment Spray System Design Criteria

Published by Publication Date Number of Pages
ANS 01/01/1979 44

ANS 56.5 – PWR and BWR Containment Spray System Design Criteria

This standard provides the design, performance, testing, maintenance, and instrumentation and control requirements for the containment spray system for boiling water and pressurized water reactor stationary electric generating plants.

The containment spray system, consisting of a spray subsystem, serves to mitigate the consequences of a loss of coolant accident, a PWR Feedwater line or a PWR steam line break, by injecting a water spray into the containment atmosphere. The containment spray system may be used to aid safety by performing one or more of the following functions: (1) Containment Post-Accident Pressure Suppression (2) Containment Post-Accident Heat Removal (3) Containment Atmosphere Post-Accident Fission Product Removal (4) Post-Accident Mixing of Containment Atmosphere (5) Post-Accident Containment Sump Chemistry Control.

Product Details

Published:
01/01/1979
ANSI:
ANSI Approved
Number of Pages:
44
File Size:
1 file , 3 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus

Reviews

There are no reviews yet.

Be the first to review “ANS 56.5”

Your email address will not be published. Required fields are marked *

Shopping Cart
ANS 56.5
Original price was: $164.00.Current price is: $98.00.