Establishes time response design criteria for safety-related operator actions to be used in design of light water reactor nuclear power plants. Specifies time requirements that are to be met to receive credit in the safety analysis for operator actions.
- Published:
- 08/23/1994
- Number of Pages:
- 28
- File Size:
- 1 file , 2.2 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus
Reviews
There are no reviews yet.