This Recommended Practice supersedes RP 95F, First Edition, May 2006.RP 95 supplements API RP 2SK, RP 2I, and RP2SM for Gulf Of Mexico MODU mooring design, operation, inspection and maintenance practices during hurricane season. Topics addressed in RP 95F that will be part of the overall mooring design and MODU operations include:
- Mooring Analysis
- Mooring Design Criteria
- Consequences of Failure
- Indicative GOM hurricane extreme metocean conditions
- Site-specific risk assessment and mitigation
- Mooring hardware issues such as anchor system considerations and mooring system improvements
- Mooring operation issues such as deployment, hurricane preparedness, and inspection
This RP was developed through a cooperative arrangement with the American Petroleum Institute’s Subcommittee on Offshore Structures – RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled “US Gulf of Mexico Mooring Strength Reliability” (MODU JIP).
- Edition:
- 2nd
- Published:
- 04/01/2007
- Number of Pages:
- 42
- File Size:
- 1 file , 760 KB
- Product Code(s):
- G95F02, G95F02, G95F02
- Note:
- This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Reviews
There are no reviews yet.