The Coordinated Test Plan presents a general outline for a total test for a system for the testing and evaluation conducted during development, and coordinates the engineering and service tests. DID DI-MGMT-80937A is used in preparation of detailed test plans, schedules, procedures, and to establish the test logic, schedule procedures, test objectives, and design verification for the integration of subsystems.
- Published:
- 08/20/2019
- Number of Pages:
- 2
- File Size:
- 1 file , 63 KB
Reviews
There are no reviews yet.