SAME AS ANSI C83.77
All test points shall be compatible in ali respects with thelatest issue of EIA Standard RS-188, Standard Dimensional Systemfor Automation Requirements.
All test points shall be brought out to any three edges of theprinted wiring board whenever possible.
There are two preferred test-point location systems, A and B. Athird system, C, can be used when it is impractical to bringthe test points to the edge of the board.
- Edition:
- 58
- Published:
- 01/01/1958
- Number of Pages:
- 4
- File Size:
- 0 files
Reviews
There are no reviews yet.