Description
This document details the qualification requirements for surfacemount aluminum chip capacitors with polymer cathode. Thequalification program is defined in Table 1. Specification sheetscan be added, as required, to define specific products or to coverunique/specific requirements. This document does not relieve thesupplier of their responsibility to their own company’s internalqualification program.
Preconditioning
This process is intended to simulate exposure to the moisture,thermal and cleaning environments of the assembly process beforequalification testing. The component assembly process simulationrequirements for different types of processes are described inIPC-9504. It is required that a flux with a pH of less than 2 beused for this preconditioning requirement.
- Edition:
- 07
- Published:
- 10/01/2007
- Number of Pages:
- 15
- File Size:
- 0 files
Reviews
There are no reviews yet.