The technical requirements in the present document reflect, in part, the results of studies undertaken within the CEPT on compatibility between broadband direct air-to-ground systems and other applications operating within, or adjacent to, the frequency bands which are designated for BDA2GC operations. These studies are described in ECC Report 209 [i.2] (for the 1 900 MHz to 1 920 MHz band) and ECC Report 210 [i.3] (for the 5 855 MHz to 5 875 MHz band).
The resulting technical and operational requirements to be applied to BDA2GC systems in the 1 900 MHz to 1 920 MHz bands and the 5 855 MHz to 5 875 MHz bands are contained within ECC Decision(15)02 [i.4] and ECC Decision(15)03 [i.5] respectively.
- Edition:
- 1.1.1
- Published:
- 06/01/2016
- Number of Pages:
- 37
- File Size:
- 1 file , 240 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus
Reviews
There are no reviews yet.