The Scope of this GTS is to clarify how interworking can be obtained between phase 2 mobile stations and phase 1 infrastructure.The objective is to obtain this without changing the consolidated set of phase 1 specifications. This Technical Report specifies the necessary amendments to the phase 1 infrastructure so that an acceptable service is offered to mobile stations of phase 2, guaranteeing that a phase 2 mobile station obtains all phase 1 services.This report outlines the necessary changes as well as the necessary controls and clarificationswith regard to phase 1 implementation, which should be performed to the different interfaces in phase 1 infrastructure before phase 2 mobiles are offered service.
- Edition:
- 5.1.0
- Published:
- 02/01/2001
- Number of Pages:
- 19
- File Size:
- 1 file , 110 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus
Reviews
There are no reviews yet.