Sale!

ISA 77.20.01

Original price was: $252.00.Current price is: $126.00.

The scope of this standard is to address the simulation offossil fuel power plants typically consisting of:

• Boiler, turbine, and balance of plant with steaming capacitiesof 200,000 lbs/hr (25 kg/s) or greater

• Combustion turbine or combined cycle combustion turbinecapacity of greater than 100MWs

• Associated or interactive processes

This standard will address high-fidelity process and controllogic models, highly replicated user interfaces, highly functionalinstructor tools, high-realism physical fidelity traineeenvironments, simulator platform considerations, and minimum levelsof documentation.

Purpose

The purpose of this standard is to establish the functionalrequirements for several types of plant-specific, fossil fuel powerplant control room simulators. It sets minimum criteria for thedegree of software modeling detail and hardware replication,performance, and functional capabilities of the simulator controlroom operator interfaces. This standard does not address DCStie-back simulators, or simulators used primarily for engineeringpurposes. This standard does not establish criteria for the use ofsimulators in training programs.

Operating and training practices and procedures differconsiderably among the various organizations that operate fossilfuel plant control room simulators, however, the goals of personnelsafety, maximum equipment availability and lifetime, and efficiencyof operations are common to all. Therefore, this standard isintended to provide flexibility in both design and use.

Edition:
12
Published:
02/09/2012
ANSI:
ANSI Approved
Number of Pages:
42
File Size:
1 file , 510 KB

Reviews

There are no reviews yet.

Be the first to review “ISA 77.20.01”

Your email address will not be published. Required fields are marked *

Shopping Cart
ISA 77.20.01
Original price was: $252.00.Current price is: $126.00.