The scope of this standard is to address the unit/plant demanddevelopment subsystem for boilers with steaming capacities of200,000 lbs/hr (25 kg/s) or greater. This subsystem includesgeneration demand, boiler demand development, turbine demanddevelopment, throttle/header pressure control, and unitmegawatt/steam flow control as applicable.
This standard will address two types of processapplications:
a) a single boiler supplying a single turbine, typical of anelectric utility power plant; and
b) a single boiler or multiple boilers supplying a commondistribution header, typical of an industrial power plant.
Specifically excluded from consideration are:
a) dispatch control;
b) turbine/generator control (other than turbine demand);
c) feedwater controls
d) steam temperature controls (covered separately byANSI/ISA-77.44.01, Fossil Fuel Power Plant – Steam TemperatureControls);
e) combustion controls (covered separately by ANSI/ISA-77.41.01,Fossil Fuel Power Plant Boiler Combustion Controls);
f) steam distribution control systems;
g) economic loading of boilers; and
h) fluidized bed boilers.
Purpose
The purpose of this document is to establish the minimumrequirements for the functional design specifications of unit/plantdemand development for control systems for fossil-fueled powerplant boilers.
- Edition:
- 14
- Published:
- 12/22/2014
- ANSI:
- ANSI Approved
- Number of Pages:
- 32
- File Size:
- 1 file , 520 KB
Reviews
There are no reviews yet.