ANSI APPROVAL WITHDRAWN MARCH 2004
1.0 INTENT
This procedure provides for a test to determine the ability of acabled and mated connector (plug and receptacle) to resist firewallenvironments, such as flame or ignition of gases. Optical operationis required for 5 minutes and physical integrity for 20minutes.
- Edition:
- 86
- Published:
- 04/01/1986
- Number of Pages:
- 14
- File Size:
- 1 file , 250 KB
Reviews
There are no reviews yet.